10th Australian Small Bridges Conference 2020
 
Our Timber Bridge Topics include:
 
Dr Dan Tingley
Senior Engineer and Wood Technologist,
Wood Research and Development,, CANADA
CANADA’S LONGEST 3 LANE DESIGN TIMBER BRIDGE – NAPPAN MARSH BRIDGE
 
Marcia Prelog
Associate
Aurecon
THARWA BRIDGE MAINTENANCE – LESSONS LEARNT
 
Dr Dan Tingley - 2
Senior Engineer and Wood Technologist
Wood Research and Development, CANADA
TIMBER UPGRADES AND REPAIRS TO SUSTAIN HISTORICAL LANDMARK - SOUTH ARM BRIDGE, BYRON SHIRE COUNCIL
 
Stephen Richards
Contracts and Client Relations Manager,
Wood Research and Development
REVIEW OF LOG GIRDER BRIDGE CONNECTIONS – SUGARLOAF ROAD BRIDGE
 
 
Stephen Wood
Bridge and Structures Engineer
Port Macquarie - Hastings Council
REPLACEMENT OF THREE TIMBER BRIDGES IN 30 DAYS BY PORT MACQUARIE-HASTINGS COUNCIL
 
Logan Mullaney
Managing Director
InQuik Bridging Systems
ACCELERATED PROGRAM TO REPLACE 3 LOAD LIMITED TIMBER BRIDGES FOR THE UPPER LACHLAN SHIRE COUNCIL TO SM1600
 
Dr Torill Pape
Technical Director Transport,
AECOM
Susie Seeto
Structural Engineer
AECOM
TIMBER BRIDGE REPLACEMENT STRATEGY
  
Peter Routledge
Technical Principal
WSP Opus NEW ZEALAND
THE RAKAIA GORGE BRIDGE DECK REPLACEMENT AND SEISMIC STRENGTHENING
 
Read all of our Abstracts for the above Topics  HERE